Next Action Required
Fabrication Phase: Proceed to weld base frame according to Spec Doc A.

Booster Skid Alpha (PRJ-2026-038)

Client: SpaceX | Connected Quote: QT-8991
In Fabrication
Target: May 15, 2026

Project Timeline

AprilMayJune
Today
Engineering
Design
Fabrication (Current)
Testing
Shipping

Fabrication Checklist

2/5 Completed

Documents & CAD Files

Drag and drop CAD files, testing checklists, or spec sheets here

Bill of Materials (BOM)

2" Steel Tubing (40ft)In Stock
Manifold Valves (x4)In Stock
Pump Motor 5HPLow (1 Left)
Control VFD PanelOUT OF STOCK

Activity Trail

Today, 9:15 AM
Alex C. checked off "Prep base plates"
Yesterday, 3:30 PM
Sarah T. uploaded base_frame_v2.dwg
Yesterday, 1:00 PM
System moved project from Design to Fabrication
Oct 12, 10:00 AM
Drew H. approved connected Quote QT-8991